A Status Report is available for viewing after each simulation. It contains:
A list of any error conditions encountered during the run.
A summary listing of the project's input data, if requested in the Simulation Options.
A summary of the data read from each rainfall file used in the simulation.
A description of each control rule action taken during the simulation, if requested in the Simulation Options.
The system-wide mass continuity errors for:
Runoff quantity and quality
Groundwater flow
Conveyance system flow and water quality
The following summary tables:
The names of the five nodes with the highest individual flow continuity errors.
The names of the five nodes or conduits that most often determined the size of the time step used for flow routing - only when the Variable Time Step option is used.
Information on the range of routing time steps taken, and the percentage of these that were considered steady state.
The Output Manager displays when the analysis is complete. This allows you to specify the destination of the Status Report that will be generated during the analysis. To direct the Status Report to:
The Output Window, select the Screen output checkbox.
A Printer, select the Printer output checkbox.
A file, select the File output checkbox.