The following principles are followed in erf connection design.
Sewer in Midblock
Label |
Description
|
LE |
This is the length of an erf. You must decide whether this length is enough to drain the whole erf, and if necessary, adjust it upwards. |
B |
The distance the erf connection point on the erf is located from:
|
A |
The distance a municipal sewer is located from the erf boundary. There is a negative result if the municipal sewer line position is Inside Erf. |
MGL |
The minimum or lowest ground level on an erf. There is an option on the Erf Connection Defaults that if selected, calculates the minimum ground level on the erf when the erf is indicated while the erf connection is added. If not, you must indicate the position for the minimum ground level point. |
GLC |
Ground Level at the erf connection. |
MILS |
The
maximum or highest invert level of the sewer. Design Formulae: Sewer inside erf: MILS = MGL - DH - SLOPE x (LE - A) - Sewer DIA Sewer outside erf or in road reserve: MILS = MGL - DH - SLOPE x (LE + A) - Sewer DIA |
ILS |
Invert
level of sewer. |
ILC |
Invert
level of erf connection. Design Formulae: Sewer inside erf: ILC = MGL - DH - SLOPE x (LE - A - B) Sewer outside erf or in road reserve: ILC = MGL - DH - SLOPE x (LE - B) |
DS |
Depth of sewer below MGL on erf. Design Formulae: DS = MGL - ILS |
DC |
Depth of Erf connection below GLC. (DC = GLC - ILC) |
DH |
Depth of House connection below MGL on Erf. (DH = Minimum Cover on house connection + Erf Connection DIA) |
Sewer in Road Reserve
Label
|
Description |
LE |
This is the length of an erf. You must decide whether this length is enough to drain the whole erf, and if necessary adjust it upwards. |
B |
The distance the erf connection point on the erf is located from the erf boundary. |
A |
The distance a municipal sewer is located from the erf boundary. |
MGL |
The minimum or lowest ground level on an erf. There is an option on the Erf Connection Defaults that, if selected, calculates the minimum ground level on the erf when the erf is indicated while the erf connection is added. If not selected, you must indicate the position for the minimum ground level point. |
GLC |
Ground Level at the erf connection. |
DC |
Depth of Erf connection below GLC. (DC = GLC - ILC) |
DH |
Depth of House connection below MGL on Erf. (DH = Minimum Cover on house connection + Erf Connection DIA) |
MILS |
The
maximum or highest invert level of the sewer. Design Formulae: Sewer inside erf: MILS = MGL - DH - SLOPE x (LE - A) - Sewer DIA Sewer outside erf or in road reserve: MILS = MGL - DH - SLOPE x (LE + A) - Sewer DIA |
ILS |
Invert
level of sewer. |
ILC |
Invert
level of erf connection. Design Formulae: Sewer inside erf: ILC = MGL - DH - SLOPE x (LE - A - B) Sewer outside erf or in road reserve: ILC = MGL - DH - SLOPE x (LE - B) |
E |
The height difference between Invert Level of Sewer (ILS) at the y-piece and the Invert Level of the erf connection (ILC) at the end of the connection. Design Formulae: Sewer inside erf: E = ILC - ILS Sewer outside erf or in road reserve: E = ILC - ILS |
See Also Erf Connection Data, Erf Connection Defaults, Erf Connection Types, Erf Connection Results.